ChargeCensus

Lexingtontoyota Toyota- Ct4020

Available

EV charging station in Lexington, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 234630.

At a glance

Lexingtontoyota Toyota- Ct4020 is a public EV charging station at 389 Massachusetts Ave in Lexington, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 19, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID234630
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 19, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
389 Massachusetts Ave
ZIP
02420
Coordinates
42.42792, -71.20073

Within ~15 km

Nearby charging

What kind of charging does Lexingtontoyota Toyota- Ct4020 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Lexingtontoyota Toyota- Ct4020 compare with other stations in Lexington?

Lexington has 28 charging stations in the DOE registry with 90 ports. Lexingtontoyota Toyota- Ct4020 accounts for 2% of the charging ports in Lexington. ChargePoint runs 18 stations in Lexington. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Lexingtontoyota Toyota- Ct4020?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lexingtontoyota Toyota- Ct4020 have?

Lexingtontoyota Toyota- Ct4020 has 2 charging ports: 2 Level 2.

Does Lexingtontoyota Toyota- Ct4020 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Lexingtontoyota Toyota- Ct4020 have?

Lexingtontoyota Toyota- Ct4020 has J1772 connectors.

Is Lexingtontoyota Toyota- Ct4020 open to the public?

Yes. Lexingtontoyota Toyota- Ct4020 is listed with public access, and its status is available.

Where is Lexingtontoyota Toyota- Ct4020?

Lexingtontoyota Toyota- Ct4020 is at 389 Massachusetts Ave, Lexington, MA 02420. Its coordinates are 42.42792, -71.20073.

More EV charging around Lexington

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 234630, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lexingtontoyota Toyota- Ct4020, Lexington, MA (AFDC station 234630)”, https://chargecensus.com/stations/massachusetts/lexingtontoyota-toyota-ct4020-234630 (data as of October 12, 2026).