ChargeCensus

EV charging in Lexington, MA

28 charging stations in Lexington, Massachusetts — networks, port mixes and a page for every station.

Dataset updated . Refreshed weekly from the US DOE Alternative Fuels Data Center.

At a glance

Lexington, Massachusetts has 28 EV charging stations in the US DOE registry (28 public) with 90 charging ports: 16 DC fast and 74 Level 2. That is the 31st-most of 331 cities and towns in Massachusetts. ChargePoint runs the most stations here (18).

Stations
28
Public
28
DC fast ports
16
Level 2 ports
74

Port ranking

Biggest stations in Lexington

#StationPortsNetwork
1Hayden Research Campus - East GarageAvailable18AmpUp
2Hayden Research Campus - West GarageAvailable10AmpUp
3Lexington, MA - Tesla SuperchargerAvailable8Tesla Supercharger
44 Hartwell AveAvailable8AmpUp
5MassDOT I-95NB Lexington Service PlazaAvailable4Non-networked
6Jamsan LexingtonAvailable4Blink
7Lexington Ma Depot Sq 2Available2ChargePoint
8Lexington Ma Lexnstar03Available2ChargePoint
9Lexington Ma Depot Sq 1Available2ChargePoint
10Lexington Ma Center Lot 2Available2ChargePoint
11Lexington Ma Center Lot 1Available2ChargePoint
1229 Hartwell AveTemporarily unavailable2ChargeLab
1335 Hartwell AveAvailable2ChargeLab
1460 Westview StAvailable2ChargeLab
15Lexington Ma Lexnstar02Available2ChargePoint

🔒 Create a free account to export CSV — all 28 in Lexington · already signed in? Export from your account →

Operators

Networks here

Growth

Stations opened by year

2019
3
2020
3
2021
9
2022
6
2023
2
2024
1
2025
4

How many public EV charging stations are in Lexington?

All 28 stations the registry lists in Lexington are open to the public. 1 station is reported temporarily unavailable. The average station here has 3.2 ports, about 22% above the Massachusetts average of 2.6. Lexington holds under 1% of Massachusetts's 4,921 charging stations.

Where is DC fast charging in Lexington?

Lexington has 16 DC fast ports (often called Level 3 charging) at 6 public stations. The largest are Lexington, MA - Tesla Supercharger (8 DC fast), MassDOT I-95NB Lexington Service Plaza (4 DC fast), Massdot Lex Plaza 1 (1 DC fast) and Massdot Lex Plaza 2 (1 DC fast). 1 of them is a Tesla Supercharger site. Across the public stations, 5 list CCS, 3 list NACS (Tesla) and 2 list CHAdeMO connectors.

What kinds of places have EV chargers in Lexington?

Where the registry records the site type, the most common hosts are research facility (2), rest stop (2) and office building (1).

Which charging networks operate in Lexington?

By station count, the networks in Lexington are led by ChargePoint (18), ChargeLab (4), AmpUp (3) and Tesla Supercharger (1). 1 station is non-networked. 6 networks in all have stations here.

How fast is EV charging growing in Lexington?

The earliest station open year on record in Lexington is 2019. 4 stations opened in 2025, compared with 1 in 2024.

Directory

All 28 public charging stations in Lexington

Frequently asked questions

How many EV charging stations are in Lexington, MA?

The US DOE registry lists 28 charging stations in Lexington, Massachusetts (28 public), with 90 charging ports: 16 DC fast and 74 Level 2.

Where can I fast-charge in Lexington?

Lexington has 16 DC fast ports. The biggest DC fast sites are Lexington, MA - Tesla Supercharger (8 ports), MassDOT I-95NB Lexington Service Plaza (4 ports) and Massdot Lex Plaza 1 (1 port).

Which charging networks operate in Lexington?

By station count: ChargePoint (18), ChargeLab (4), AmpUp (3), Tesla Supercharger (1) and Non-networked (1).

Are there Tesla Superchargers in Lexington?

Yes. The registry lists 1 public Tesla Supercharger site in Lexington: Lexington, MA - Tesla Supercharger (8 DC fast ports).

More EV charging near Lexington

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “EV charging in Lexington, MA”, https://chargecensus.com/ev-charging/massachusetts/lexington (data as of October 12, 2026).