ChargeCensus

Lee Branch Greylock Fcu

Available

EV charging station in Lee, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 348996.

At a glance

Lee Branch Greylock Fcu is a public EV charging station at 43 Park Street in Lee, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 22, 2024.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID348996
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 22, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
43 Park Street
City
Lee
ZIP
01238
Coordinates
42.30382, -73.24795

Within ~15 km

Nearby charging

What kind of charging does Lee Branch Greylock Fcu offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Lee Branch Greylock Fcu compare with other stations in Lee?

Lee has 11 charging stations in the DOE registry with 46 ports. Lee Branch Greylock Fcu accounts for 2% of the charging ports in Lee. ChargePoint runs 4 stations in Lee. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Lee Branch Greylock Fcu?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 22, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lee Branch Greylock Fcu have?

Lee Branch Greylock Fcu has 1 charging port: 1 Level 2.

Does Lee Branch Greylock Fcu have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Lee Branch Greylock Fcu have?

Lee Branch Greylock Fcu has J1772 connectors.

Is Lee Branch Greylock Fcu open to the public?

Yes. Lee Branch Greylock Fcu is listed with public access, and its status is available.

Where is Lee Branch Greylock Fcu?

Lee Branch Greylock Fcu is at 43 Park Street, Lee, MA 01238. Its coordinates are 42.30382, -73.24795.

More EV charging around Lee

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 348996, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lee Branch Greylock Fcu, Lee, MA (AFDC station 348996)”, https://chargecensus.com/stations/massachusetts/lee-branch-greylock-fcu-348996 (data as of October 12, 2026).