ChargeCensus

Goldman Group

Available

EV charging station in Great Barrington, Massachusetts on the Red E network — 6 DC fast. US DOE AFDC station 459222.

At a glance

Goldman Group is a public EV charging station at 148 Maple Ave in Great Barrington, Massachusetts, on the Red E network. It has 6 charging ports (6 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 7, 2026.

Total ports
6
DC fast
6
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID459222
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateMay 7, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
148 Maple Ave
ZIP
01230
Coordinates
42.18565, -73.36958

Within ~15 km

Nearby charging

What kind of charging does Goldman Group offer?

Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 2.3 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Goldman Group compare with other stations in Great Barrington?

Great Barrington has 10 charging stations in the DOE registry with 38 ports. Goldman Group accounts for 16% of the charging ports in Great Barrington. Red E runs 2 stations in Great Barrington. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Goldman Group?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 153 of those stations are in Massachusetts, 3% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 7, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Goldman Group have?

Goldman Group has 6 charging ports: 6 DC fast.

Does Goldman Group have DC fast charging?

Yes. The registry lists 6 DC fast ports at Goldman Group, with CCS connectors.

What connectors does Goldman Group have?

Goldman Group has CCS connectors.

Is Goldman Group open to the public?

Yes. Goldman Group is listed with public access, and its status is available.

Where is Goldman Group?

Goldman Group is at 148 Maple Ave, Great Barrington, MA 01230. Its coordinates are 42.18565, -73.36958.

More EV charging around Great Barrington

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 459222, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Goldman Group, Great Barrington, MA (AFDC station 459222)”, https://chargecensus.com/stations/massachusetts/goldman-group-459222 (data as of October 12, 2026).