ChargeCensus

Consigli Construction Co.

Available

EV charging station in Milford, Massachusetts on the AmpUp network — 8 Level 2. US DOE AFDC station 230623.

At a glance

Consigli Construction Co. is a private EV charging station at 72 Sumner St in Milford, Massachusetts, on the AmpUp network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 15, 2022.

Total ports
8
DC fast
0
Level 2
8
Access
Private
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID230623
NetworkAmpUp
StatusAvailable (E)
AccessPrivate
FacilityOffice building
Open dateSep 15, 2022
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
72 Sumner St
ZIP
01757
Coordinates
42.15334, -71.52130

Within ~15 km

Nearby charging

What kind of charging does Consigli Construction Co. offer?

Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a office building location.

How does Consigli Construction Co. compare with other stations in Milford?

Milford has 18 charging stations in the DOE registry with 79 ports. Consigli Construction Co. accounts for 10% of the charging ports in Milford. It is the only AmpUp station in Milford. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Consigli Construction Co.?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 198 of those stations are in Massachusetts, 4% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Sep 15, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Consigli Construction Co. have?

Consigli Construction Co. has 8 charging ports: 8 Level 2.

Does Consigli Construction Co. have DC fast charging?

No. The registry lists no DC fast ports here; its 8 ports are all Level 2.

What connectors does Consigli Construction Co. have?

Consigli Construction Co. has J1772 connectors.

Is Consigli Construction Co. open to the public?

No. Consigli Construction Co. is listed with private access.

Where is Consigli Construction Co.?

Consigli Construction Co. is at 72 Sumner St, Milford, MA 01757. Its coordinates are 42.15334, -71.52130.

More EV charging around Milford

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 230623, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Consigli Construction Co., Milford, MA (AFDC station 230623)”, https://chargecensus.com/stations/massachusetts/consigli-construction-co-230623 (data as of October 12, 2026).