Big Y Uxbridge #1
AvailableEV charging station in Uxbridge, Massachusetts on the EV Connect network — 12 Level 2. US DOE AFDC station 450031.
At a glance
Big Y Uxbridge #1 is a public EV charging station at 240 S Main St in Uxbridge, Massachusetts, on the EV Connect network. It has 12 charging ports (12 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 1, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 450031 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Sep 1, 2025 |
| Last updated at source | Feb 13, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.45 per kWh
Location
- Address
- 240 S Main St
- City
- Uxbridge
- State
- Massachusetts
- ZIP
- 01569
- Coordinates
- 42.06400, -71.62122
Within ~15 km
Nearby charging
- Smithfield GWC31 ports
Non-networked · Available
- Department of Correction Milford20 ports
Non-networked · Available
- Kanso Milford10 ports
Loop · Available
- Linwood Plaza8 ports
Red E · Available
- Whitinsville Plaza8 ports
Red E · Available
- National Grid - Hopedale8 ports
ChargePoint · Available
What kind of charging does Big Y Uxbridge #1 offer?
Of its 12 ports, 12 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 4.5 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.45 per kWh”. The site is listed as a office building location.
How does Big Y Uxbridge #1 compare with other stations in Uxbridge?
Uxbridge has 5 charging stations in the DOE registry with 20 ports. Big Y Uxbridge #1 accounts for 60% of the charging ports in Uxbridge. It is the only EV Connect station in Uxbridge. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Big Y Uxbridge #1?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 23 of those stations are in Massachusetts, under 1% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 1, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Feb 13, 2026.
Frequently asked questions
How many chargers does Big Y Uxbridge #1 have?
Big Y Uxbridge #1 has 12 charging ports: 12 Level 2.
Does Big Y Uxbridge #1 have DC fast charging?
No. The registry lists no DC fast ports here; its 12 ports are all Level 2.
What connectors does Big Y Uxbridge #1 have?
Big Y Uxbridge #1 has J1772 connectors.
Is charging at Big Y Uxbridge #1 free?
Pricing as reported to the DOE registry: $0.45 per kWh.
Is Big Y Uxbridge #1 open to the public?
Yes. Big Y Uxbridge #1 is listed with public access, and its status is available.
Where is Big Y Uxbridge #1?
Big Y Uxbridge #1 is at 240 S Main St, Uxbridge, MA 01569. Its coordinates are 42.06400, -71.62122.
More EV charging around Uxbridge
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 450031, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Big Y Uxbridge #1, Uxbridge, MA (AFDC station 450031)”, https://chargecensus.com/stations/massachusetts/big-y-uxbridge-1-450031 (data as of October 12, 2026).