Bedford-Evs Lane Sch 2024
AvailableEV charging station in Bedford, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 333677.
At a glance
Bedford-Evs Lane Sch 2024 is a public EV charging station at 66 Sweetwater Avenue in Bedford, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 27, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 333677 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 27, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 66 Sweetwater Avenue
- City
- Bedford
- State
- Massachusetts
- ZIP
- 01730
- Coordinates
- 42.51500, -71.27961
Within ~15 km
Nearby charging
- 52 New St18 ports
Loop · Available
AmpUp · Available
- Bedford Campus18 ports
Blink · Available
- SWTCH Energy Inc.16 ports
SWTCH · Available
Non-networked · Available
Blink · Available
What kind of charging does Bedford-Evs Lane Sch 2024 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bedford-Evs Lane Sch 2024 compare with other stations in Bedford?
Bedford has 25 charging stations in the DOE registry with 59 ports. Bedford-Evs Lane Sch 2024 accounts for 3% of the charging ports in Bedford. ChargePoint runs 21 stations in Bedford. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Bedford-Evs Lane Sch 2024?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 27, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bedford-Evs Lane Sch 2024 have?
Bedford-Evs Lane Sch 2024 has 2 charging ports: 2 Level 2.
Does Bedford-Evs Lane Sch 2024 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bedford-Evs Lane Sch 2024 have?
Bedford-Evs Lane Sch 2024 has J1772 connectors.
Is Bedford-Evs Lane Sch 2024 open to the public?
Yes. Bedford-Evs Lane Sch 2024 is listed with public access, and its status is available.
Where is Bedford-Evs Lane Sch 2024?
Bedford-Evs Lane Sch 2024 is at 66 Sweetwater Avenue, Bedford, MA 01730. Its coordinates are 42.51500, -71.27961.
More EV charging around Bedford
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 333677, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bedford-Evs Lane Sch 2024, Bedford, MA (AFDC station 333677)”, https://chargecensus.com/stations/massachusetts/bedford-evs-lane-sch-2024-333677 (data as of October 12, 2026).