ChargeCensus

52 New St

Available

EV charging station in Cambridge, Massachusetts on the Loop network — 18 Level 2. US DOE AFDC station 463216.

At a glance

52 New St is a public EV charging station at 52 New St in Cambridge, Massachusetts, on the Loop network. It has 18 charging ports (18 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 28, 2026.

Total ports
18
DC fast
0
Level 2
18
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID463216
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateJan 28, 2026
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
52 New St
ZIP
02138
Coordinates
42.38788, -71.14219

Within ~15 km

Nearby charging

What kind of charging does 52 New St offer?

Of its 18 ports, 18 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 6.8 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does 52 New St compare with other stations in Cambridge?

Cambridge has 409 charging stations in the DOE registry with 968 ports, the 2nd-most of 331 cities and towns in Massachusetts. 52 New St accounts for 2% of the charging ports in Cambridge. Loop runs 2 stations in Cambridge. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates 52 New St?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 32 of those stations are in Massachusetts, under 1% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 28, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does 52 New St have?

52 New St has 18 charging ports: 18 Level 2.

Does 52 New St have DC fast charging?

No. The registry lists no DC fast ports here; its 18 ports are all Level 2.

What connectors does 52 New St have?

52 New St has J1772 connectors.

Is 52 New St open to the public?

Yes. 52 New St is listed with public access, and its status is available.

Where is 52 New St?

52 New St is at 52 New St, Cambridge, MA 02138. Its coordinates are 42.38788, -71.14219.

More EV charging around Cambridge

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 463216, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “52 New St, Cambridge, MA (AFDC station 463216)”, https://chargecensus.com/stations/massachusetts/52-new-st-463216 (data as of October 12, 2026).