35 Wiggins Ave
AvailableEV charging station in Bedford, Massachusetts on the ChargeLab network — 2 Level 2. US DOE AFDC station 400192.
At a glance
35 Wiggins Ave is a public EV charging station at 35 Wiggins Ave in Bedford, Massachusetts, on the ChargeLab network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 22, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 400192 |
| Network | ChargeLab |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 22, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 35 Wiggins Ave
- City
- Bedford
- State
- Massachusetts
- ZIP
- 01730
- Coordinates
- 42.48081, -71.26364
Within ~15 km
Nearby charging
- 280 Western Ave26 ports
AmpUp · Available
- Harvard University22 ports
Non-networked · Available
- 52 New St18 ports
Loop · Available
AmpUp · Available
- Bedford Campus18 ports
Blink · Available
- Harvard University16 ports
Non-networked · Available
What kind of charging does 35 Wiggins Ave offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 35 Wiggins Ave compare with other stations in Bedford?
Bedford has 25 charging stations in the DOE registry with 59 ports. 35 Wiggins Ave accounts for 3% of the charging ports in Bedford. It is the only ChargeLab station in Bedford. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates 35 Wiggins Ave?
ChargeLab operates 406 stations in the registry across 38 states, with 325 DC fast and 1,312 Level 2 ports in total. 25 of those stations are in Massachusetts, under 1% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 22, 2025, one of 680 stations in Massachusetts with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 35 Wiggins Ave have?
35 Wiggins Ave has 2 charging ports: 2 Level 2.
Does 35 Wiggins Ave have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 35 Wiggins Ave have?
35 Wiggins Ave has J1772 connectors.
Is 35 Wiggins Ave open to the public?
Yes. 35 Wiggins Ave is listed with public access, and its status is available.
Where is 35 Wiggins Ave?
35 Wiggins Ave is at 35 Wiggins Ave, Bedford, MA 01730. Its coordinates are 42.48081, -71.26364.
More EV charging around Bedford
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 400192, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “35 Wiggins Ave, Bedford, MA (AFDC station 400192)”, https://chargecensus.com/stations/massachusetts/35-wiggins-ave-400192 (data as of October 12, 2026).