Washcoll Bunting 2
AvailableEV charging station in Chestertown, Maryland on the ChargePoint network — 2 Level 2. US DOE AFDC station 375880.
At a glance
Washcoll Bunting 2 is a public EV charging station at 300 Washington Avenue in Chestertown, Maryland, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 18, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 375880 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 18, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 300 Washington Avenue
- City
- Chestertown
- State
- Maryland
- ZIP
- 21620
- Coordinates
- 39.21638, -76.06872
Within ~15 km
Nearby charging
Tesla Destination · Available
- Comfort Inn Chestertown4 ports
Blink · Available
- Washington College3 ports
Non-networked · Available
- Washcoll Bunting 32 ports
ChargePoint · Available
- Skipjack Art Studios2 ports
Noodoe · Available
- Washcoll Tennis Center 12 ports
ChargePoint · Available
What kind of charging does Washcoll Bunting 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Washcoll Bunting 2 compare with other stations in Chestertown?
Chestertown has 9 charging stations in the DOE registry with 23 ports. Washcoll Bunting 2 accounts for 9% of the charging ports in Chestertown. ChargePoint runs 4 stations in Chestertown. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Washcoll Bunting 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 18, 2025, one of 415 stations in Maryland with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Washcoll Bunting 2 have?
Washcoll Bunting 2 has 2 charging ports: 2 Level 2.
Does Washcoll Bunting 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Washcoll Bunting 2 have?
Washcoll Bunting 2 has J1772 connectors.
Is Washcoll Bunting 2 open to the public?
Yes. Washcoll Bunting 2 is listed with public access, and its status is available.
Where is Washcoll Bunting 2?
Washcoll Bunting 2 is at 300 Washington Avenue, Chestertown, MD 21620. Its coordinates are 39.21638, -76.06872.
More EV charging around Chestertown
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 375880, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Washcoll Bunting 2, Chestertown, MD (AFDC station 375880)”, https://chargecensus.com/stations/maryland/washcoll-bunting-2-375880 (data as of October 12, 2026).