Union Lane Garage - Series 8
AvailableEV charging station in College Park, Maryland on the Blink network — 8 Level 2. US DOE AFDC station 328895.
At a glance
Union Lane Garage - Series 8 is a public EV charging station at 4170 Union Lane in College Park, Maryland, on the Blink network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 1, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 328895 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 1, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4170 Union Lane
- City
- College Park
- State
- Maryland
- ZIP
- 20742
- Coordinates
- 38.98898, -76.94618
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Destination · Available
- Goddard Space Flight Center31 ports
Non-networked · Available
- DOE Forrestal24 ports
Non-networked · Available
- Rosslyn Towers24 ports
Loop · Available
- The Wilson & The Elm Apex Garage23 ports
AmpUp · Available
What kind of charging does Union Lane Garage - Series 8 offer?
Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.3 times the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Union Lane Garage - Series 8 compare with other stations in College Park?
College Park has 41 charging stations in the DOE registry with 129 ports, the 7th-most of 248 cities and towns in Maryland. Union Lane Garage - Series 8 accounts for 6% of the charging ports in College Park. Blink runs 10 stations in College Park. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Union Lane Garage - Series 8?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 311 of those stations are in Maryland, 17% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 1, 2023, one of 257 stations in Maryland with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Union Lane Garage - Series 8 have?
Union Lane Garage - Series 8 has 8 charging ports: 8 Level 2.
Does Union Lane Garage - Series 8 have DC fast charging?
No. The registry lists no DC fast ports here; its 8 ports are all Level 2.
What connectors does Union Lane Garage - Series 8 have?
Union Lane Garage - Series 8 has J1772 connectors.
Is Union Lane Garage - Series 8 open to the public?
Yes. Union Lane Garage - Series 8 is listed with public access, and its status is available.
Where is Union Lane Garage - Series 8?
Union Lane Garage - Series 8 is at 4170 Union Lane, College Park, MD 20742. Its coordinates are 38.98898, -76.94618.
More EV charging around College Park
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 328895, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Union Lane Garage - Series 8, College Park, MD (AFDC station 328895)”, https://chargecensus.com/stations/maryland/union-lane-garage-series-8-328895 (data as of October 12, 2026).