ChargeCensus

The Yards at Fieldside Village

Available

EV charging station in Aberdeen, Maryland on the Blink network — 1 Level 2. US DOE AFDC station 148215.

At a glance

The Yards at Fieldside Village is a public EV charging station at 816 Long Dr in Aberdeen, Maryland, on the Blink network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 6, 2019.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID148215
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateSep 6, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: FREE

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
816 Long Dr
ZIP
21001
Coordinates
39.53286, -76.18952

Within ~15 km

Nearby charging

What kind of charging does The Yards at Fieldside Village offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “FREE”.

How does The Yards at Fieldside Village compare with other stations in Aberdeen?

Aberdeen has 15 charging stations in the DOE registry with 109 ports, the 25th-most of 248 cities and towns in Maryland. The Yards at Fieldside Village accounts for under 1% of the charging ports in Aberdeen. Blink runs 3 stations in Aberdeen. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.

Who operates The Yards at Fieldside Village?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 311 of those stations are in Maryland, 17% of the state's 1,866.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 6, 2019, one of 87 stations in Maryland with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does The Yards at Fieldside Village have?

The Yards at Fieldside Village has 1 charging port: 1 Level 2.

Does The Yards at Fieldside Village have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does The Yards at Fieldside Village have?

The Yards at Fieldside Village has J1772 connectors.

Is charging at The Yards at Fieldside Village free?

Pricing as reported to the DOE registry: FREE.

Is The Yards at Fieldside Village open to the public?

Yes. The Yards at Fieldside Village is listed with public access, and its status is available.

Where is The Yards at Fieldside Village?

The Yards at Fieldside Village is at 816 Long Dr, Aberdeen, MD 21001. Its coordinates are 39.53286, -76.18952.

More EV charging around Aberdeen

Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 148215, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “The Yards at Fieldside Village, Aberdeen, MD (AFDC station 148215)”, https://chargecensus.com/stations/maryland/the-yards-at-fieldside-village-148215 (data as of October 12, 2026).