Stonehall P2-05
AvailableEV charging station in Bethesda, Maryland on the ChargePoint network — 1 Level 2. US DOE AFDC station 422070.
At a glance
Stonehall P2-05 is a public EV charging station at 8302 Woodmont Ave in Bethesda, Maryland, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 11, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 422070 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 11, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Destination · Available
- 915 Meeting30 ports
Noodoe · Available
- Rosslyn Towers24 ports
Loop · Available
- DOE Forrestal24 ports
Non-networked · Available
- The Wilson & The Elm Apex Garage23 ports
AmpUp · Available
What kind of charging does Stonehall P2-05 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Stonehall P2-05 compare with other stations in Bethesda?
Bethesda has 89 charging stations in the DOE registry with 254 ports, the 4th-most of 248 cities and towns in Maryland. Stonehall P2-05 accounts for under 1% of the charging ports in Bethesda. ChargePoint runs 58 stations in Bethesda. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Stonehall P2-05?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 11, 2025, one of 415 stations in Maryland with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Stonehall P2-05 have?
Stonehall P2-05 has 1 charging port: 1 Level 2.
Does Stonehall P2-05 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Stonehall P2-05 have?
Stonehall P2-05 has J1772 connectors.
Is Stonehall P2-05 open to the public?
Yes. Stonehall P2-05 is listed with public access, and its status is available.
Where is Stonehall P2-05?
Stonehall P2-05 is at 8302 Woodmont Ave, Bethesda, MD 20814. Its coordinates are 38.99311, -77.09740.
More EV charging around Bethesda
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 422070, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stonehall P2-05, Bethesda, MD (AFDC station 422070)”, https://chargecensus.com/stations/maryland/stonehall-p2-05-422070 (data as of October 12, 2026).