SMECO - Lexington Park Library
AvailableEV charging station in Lexington Park, Maryland on the SWTCH network — 2 Level 2. US DOE AFDC station 201783.
At a glance
SMECO - Lexington Park Library is a public EV charging station at 21677 Franklin Delano Roosevelt Blvd in Lexington Park, Maryland, on the SWTCH network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 30, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 201783 |
| Network | SWTCH |
| Status | Available (E) |
| Access | Public |
| Facility | Library |
| Open date | Nov 30, 2021 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 21677 Franklin Delano Roosevelt Blvd
- City
- Lexington Park
- State
- Maryland
- ZIP
- 20653
- Coordinates
- 38.26183, -76.45748
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
- Bernie Fowler Laboratory6 ports
Blink · Available
Non-networked · Available
Non-networked · Available
What kind of charging does SMECO - Lexington Park Library offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a library location.
How does SMECO - Lexington Park Library compare with other stations in Lexington Park?
Lexington Park has 8 charging stations in the DOE registry with 13 ports. SMECO - Lexington Park Library accounts for 15% of the charging ports in Lexington Park. SWTCH runs 4 stations in Lexington Park. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates SMECO - Lexington Park Library?
SWTCH operates 657 stations in the registry across 32 states, with 318 DC fast and 2,390 Level 2 ports in total. 292 of those stations are in Maryland, 16% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 30, 2021, one of 233 stations in Maryland with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does SMECO - Lexington Park Library have?
SMECO - Lexington Park Library has 2 charging ports: 2 Level 2.
Does SMECO - Lexington Park Library have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does SMECO - Lexington Park Library have?
SMECO - Lexington Park Library has J1772 connectors.
Is SMECO - Lexington Park Library open to the public?
Yes. SMECO - Lexington Park Library is listed with public access, and its status is available.
Where is SMECO - Lexington Park Library?
SMECO - Lexington Park Library is at 21677 Franklin Delano Roosevelt Blvd, Lexington Park, MD 20653. Its coordinates are 38.26183, -76.45748.
More EV charging around Lexington Park
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 201783, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “SMECO - Lexington Park Library, Lexington Park, MD (AFDC station 201783)”, https://chargecensus.com/stations/maryland/smeco-lexington-park-library-201783 (data as of October 12, 2026).