Potomac Edison Hancock Level 2
AvailableEV charging station in Hancock, Maryland on the ChargePoint network — 2 Level 2. US DOE AFDC station 202026.
At a glance
Potomac Edison Hancock Level 2 is a public EV charging station at Williams St in Hancock, Maryland, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 4, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 202026 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 4, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- Williams St
- City
- Hancock
- State
- Maryland
- ZIP
- 21750
- Coordinates
- 39.69867, -78.18090
Within ~15 km
Nearby charging
- Oak Barrel Café5 ports
Non-networked · Available
Tesla Destination · Available
ChargePoint · Available
Non-networked · Available
ChargePoint · Available
- Potomac Edison Hancock Dc 21 ports
ChargePoint · Available
What kind of charging does Potomac Edison Hancock Level 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Potomac Edison Hancock Level 2 compare with other stations in Hancock?
Hancock has 4 charging stations in the DOE registry with 6 ports. Potomac Edison Hancock Level 2 accounts for 33% of the charging ports in Hancock. ChargePoint runs 3 stations in Hancock. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Potomac Edison Hancock Level 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 4, 2021, one of 233 stations in Maryland with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Potomac Edison Hancock Level 2 have?
Potomac Edison Hancock Level 2 has 2 charging ports: 2 Level 2.
Does Potomac Edison Hancock Level 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Potomac Edison Hancock Level 2 have?
Potomac Edison Hancock Level 2 has J1772 connectors.
Is Potomac Edison Hancock Level 2 open to the public?
Yes. Potomac Edison Hancock Level 2 is listed with public access, and its status is available.
Where is Potomac Edison Hancock Level 2?
Potomac Edison Hancock Level 2 is at Williams St, Hancock, MD 21750. Its coordinates are 39.69867, -78.18090.
More EV charging around Hancock
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 202026, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Potomac Edison Hancock Level 2, Hancock, MD (AFDC station 202026)”, https://chargecensus.com/stations/maryland/potomac-edison-hancock-level-2-202026 (data as of October 12, 2026).