EV charging station in Owings Mills, Maryland on the ChargePoint network — 2 Level 2. US DOE AFDC station 357938.

At a glance

Mustang EV'S Stadium #1 is a public EV charging station at 11003 Campus Circle Drive in Owings Mills, Maryland, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 12, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID357938
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 12, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
11003 Campus Circle Drive
ZIP
21117
Coordinates
39.42767, -76.78035

Within ~15 km

Nearby charging

What kind of charging does Mustang EV'S Stadium #1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Mustang EV'S Stadium #1 compare with other stations in Owings Mills?

Owings Mills has 32 charging stations in the DOE registry with 86 ports, the 11th-most of 248 cities and towns in Maryland. Mustang EV'S Stadium #1 accounts for 2% of the charging ports in Owings Mills. ChargePoint runs 20 stations in Owings Mills. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.

Who operates Mustang EV'S Stadium #1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 12, 2024, one of 167 stations in Maryland with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Mustang EV'S Stadium #1 have?

Mustang EV'S Stadium #1 has 2 charging ports: 2 Level 2.

Does Mustang EV'S Stadium #1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Mustang EV'S Stadium #1 have?

Mustang EV'S Stadium #1 has J1772 connectors.

Is Mustang EV'S Stadium #1 open to the public?

Yes. Mustang EV'S Stadium #1 is listed with public access, and its status is available.

Where is Mustang EV'S Stadium #1?

Mustang EV'S Stadium #1 is at 11003 Campus Circle Drive, Owings Mills, MD 21117. Its coordinates are 39.42767, -76.78035.

More EV charging around Owings Mills

Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 357938, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mustang EV'S Stadium #1, Owings Mills, MD (AFDC station 357938)”, https://chargecensus.com/stations/maryland/mustang-ev-s-stadium-1-357938 (data as of October 12, 2026).