Mdta Nmb Admin Cs-1
AvailableEV charging station in Newburg, Maryland on the ChargePoint network — 1 DC fast. US DOE AFDC station 355281.
At a glance
Mdta Nmb Admin Cs-1 is a public EV charging station at 9665 Orland Park Road in Newburg, Maryland, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Sep 11, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 355281 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 11, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 9665 Orland Park Road
- City
- Newburg
- State
- Maryland
- ZIP
- 20664
- Coordinates
- 38.36476, -76.97681
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Destination · Available
- Bayside Ford - Consumer Row3 ports
Blink · Available
Non-networked · Available
Non-networked · Available
- MDA Dahlgren2 ports
Non-networked · Available
What kind of charging does Mdta Nmb Admin Cs-1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Maryland average of 3.4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Mdta Nmb Admin Cs-1 compare with other stations in Newburg?
Newburg has 3 charging stations in the DOE registry with 4 ports. Mdta Nmb Admin Cs-1 accounts for 25% of the charging ports in Newburg. ChargePoint runs 3 stations in Newburg. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Mdta Nmb Admin Cs-1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 11, 2024, one of 167 stations in Maryland with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mdta Nmb Admin Cs-1 have?
Mdta Nmb Admin Cs-1 has 1 charging port: 1 DC fast.
Does Mdta Nmb Admin Cs-1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Mdta Nmb Admin Cs-1, with CHAdeMO and CCS connectors.
What connectors does Mdta Nmb Admin Cs-1 have?
Mdta Nmb Admin Cs-1 has CHAdeMO and CCS connectors.
Is Mdta Nmb Admin Cs-1 open to the public?
Yes. Mdta Nmb Admin Cs-1 is listed with public access, and its status is available.
Where is Mdta Nmb Admin Cs-1?
Mdta Nmb Admin Cs-1 is at 9665 Orland Park Road, Newburg, MD 20664. Its coordinates are 38.36476, -76.97681.
More EV charging around Newburg
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 355281, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mdta Nmb Admin Cs-1, Newburg, MD (AFDC station 355281)”, https://chargecensus.com/stations/maryland/mdta-nmb-admin-cs-1-355281 (data as of October 12, 2026).