Mcdot-Parking Garage 61
AvailableEV charging station in Silver Spring, Maryland on the ChargePoint network — 2 Level 2. US DOE AFDC station 74561.
At a glance
Mcdot-Parking Garage 61 is a public EV charging station at 801 Ellsworth Dr in Silver Spring, Maryland, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 31, 2016.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 74561 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 31, 2016 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 801 Ellsworth Dr
- City
- Silver Spring
- State
- Maryland
- ZIP
- 20910
- Coordinates
- 38.99729, -77.02557
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Destination · Available
- 915 Meeting30 ports
Noodoe · Available
- DOE Forrestal24 ports
Non-networked · Available
- Rosslyn Towers24 ports
Loop · Available
- The Wilson & The Elm Apex Garage23 ports
AmpUp · Available
What kind of charging does Mcdot-Parking Garage 61 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mcdot-Parking Garage 61 compare with other stations in Silver Spring?
Silver Spring has 67 charging stations in the DOE registry with 225 ports, the 5th-most of 248 cities and towns in Maryland. Mcdot-Parking Garage 61 accounts for under 1% of the charging ports in Silver Spring. ChargePoint runs 39 stations in Silver Spring. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Mcdot-Parking Garage 61?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 31, 2016, one of 65 stations in Maryland with a 2016 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mcdot-Parking Garage 61 have?
Mcdot-Parking Garage 61 has 2 charging ports: 2 Level 2.
Does Mcdot-Parking Garage 61 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mcdot-Parking Garage 61 have?
Mcdot-Parking Garage 61 has J1772 connectors.
Is Mcdot-Parking Garage 61 open to the public?
Yes. Mcdot-Parking Garage 61 is listed with public access, and its status is available.
Where is Mcdot-Parking Garage 61?
Mcdot-Parking Garage 61 is at 801 Ellsworth Dr, Silver Spring, MD 20910. Its coordinates are 38.99729, -77.02557.
More EV charging around Silver Spring
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 74561, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mcdot-Parking Garage 61, Silver Spring, MD (AFDC station 74561)”, https://chargecensus.com/stations/maryland/mcdot-parking-garage-61-74561 (data as of October 12, 2026).