Ikea USA College Park 1
AvailableEV charging station in College Park, Maryland on the ChargePoint network — 1 Level 2. US DOE AFDC station 252916.
At a glance
Ikea USA College Park 1 is a public EV charging station at 10100 Baltimore Ave in College Park, Maryland, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 1, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 252916 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 1, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 10100 Baltimore Ave
- City
- College Park
- State
- Maryland
- ZIP
- 20740
- Coordinates
- 39.02124, -76.92819
Within ~15 km
Nearby charging
Tesla Destination · Available
- Goddard Space Flight Center31 ports
Non-networked · Available
- Rosslyn Towers24 ports
Loop · Available
- DOE Forrestal24 ports
Non-networked · Available
Non-networked · Planned
- Aerie20 ports
Loop · Available
What kind of charging does Ikea USA College Park 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ikea USA College Park 1 compare with other stations in College Park?
College Park has 41 charging stations in the DOE registry with 129 ports, the 7th-most of 248 cities and towns in Maryland. Ikea USA College Park 1 accounts for under 1% of the charging ports in College Park. ChargePoint runs 22 stations in College Park. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Ikea USA College Park 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 1, 2023, one of 257 stations in Maryland with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ikea USA College Park 1 have?
Ikea USA College Park 1 has 1 charging port: 1 Level 2.
Does Ikea USA College Park 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Ikea USA College Park 1 have?
Ikea USA College Park 1 has J1772 connectors.
Is Ikea USA College Park 1 open to the public?
Yes. Ikea USA College Park 1 is listed with public access, and its status is available.
Where is Ikea USA College Park 1?
Ikea USA College Park 1 is at 10100 Baltimore Ave, College Park, MD 20740. Its coordinates are 39.02124, -76.92819.
More EV charging around College Park
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 252916, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ikea USA College Park 1, College Park, MD (AFDC station 252916)”, https://chargecensus.com/stations/maryland/ikea-usa-college-park-1-252916 (data as of October 12, 2026).