Bozzuto Cp Tjs Garage
AvailableEV charging station in College Park, Maryland on the ChargePoint network — 2 Level 2. US DOE AFDC station 256174.
At a glance
Bozzuto Cp Tjs Garage is a public EV charging station at 4429 Calvert Rd in College Park, Maryland, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 10, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 256174 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 10, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4429 Calvert Rd
- City
- College Park
- State
- Maryland
- ZIP
- 20740
- Coordinates
- 38.97809, -76.93822
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Destination · Available
- Goddard Space Flight Center31 ports
Non-networked · Available
- Rosslyn Towers24 ports
Loop · Available
- DOE Forrestal24 ports
Non-networked · Available
- Target - Tesla Supercharger20 ports
Tesla Supercharger · Available
What kind of charging does Bozzuto Cp Tjs Garage offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bozzuto Cp Tjs Garage compare with other stations in College Park?
College Park has 41 charging stations in the DOE registry with 129 ports, the 7th-most of 248 cities and towns in Maryland. Bozzuto Cp Tjs Garage accounts for 2% of the charging ports in College Park. ChargePoint runs 22 stations in College Park. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Bozzuto Cp Tjs Garage?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 10, 2023, one of 257 stations in Maryland with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bozzuto Cp Tjs Garage have?
Bozzuto Cp Tjs Garage has 2 charging ports: 2 Level 2.
Does Bozzuto Cp Tjs Garage have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bozzuto Cp Tjs Garage have?
Bozzuto Cp Tjs Garage has J1772 connectors.
Is Bozzuto Cp Tjs Garage open to the public?
Yes. Bozzuto Cp Tjs Garage is listed with public access, and its status is available.
Where is Bozzuto Cp Tjs Garage?
Bozzuto Cp Tjs Garage is at 4429 Calvert Rd, College Park, MD 20740. Its coordinates are 38.97809, -76.93822.
More EV charging around College Park
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 256174, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bozzuto Cp Tjs Garage, College Park, MD (AFDC station 256174)”, https://chargecensus.com/stations/maryland/bozzuto-cp-tjs-garage-256174 (data as of October 12, 2026).