Bge Mud Cedar Run 2
AvailableEV charging station in Catonsville, Maryland on the ChargePoint network — 2 Level 2. US DOE AFDC station 252016.
At a glance
Bge Mud Cedar Run 2 is a public EV charging station at 493 Misty Wood Way in Catonsville, Maryland, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 25, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 252016 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 25, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 493 Misty Wood Way
- City
- Catonsville
- State
- Maryland
- ZIP
- 21228
- Coordinates
- 39.28711, -76.72320
Within ~15 km
Nearby charging
AmpUp · Available
- Arbutus, MD - Tesla Supercharger16 ports
Tesla Supercharger · Available
SWTCH · Available
- Apple Ford - Series12 ports
Blink · Available
- Jessup, MD - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Bge Mud Cedar Run 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bge Mud Cedar Run 2 compare with other stations in Catonsville?
Catonsville has 8 charging stations in the DOE registry with 32 ports. Bge Mud Cedar Run 2 accounts for 6% of the charging ports in Catonsville. ChargePoint runs 2 stations in Catonsville. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Bge Mud Cedar Run 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 25, 2023, one of 257 stations in Maryland with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bge Mud Cedar Run 2 have?
Bge Mud Cedar Run 2 has 2 charging ports: 2 Level 2.
Does Bge Mud Cedar Run 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bge Mud Cedar Run 2 have?
Bge Mud Cedar Run 2 has J1772 connectors.
Is Bge Mud Cedar Run 2 open to the public?
Yes. Bge Mud Cedar Run 2 is listed with public access, and its status is available.
Where is Bge Mud Cedar Run 2?
Bge Mud Cedar Run 2 is at 493 Misty Wood Way, Catonsville, MD 21228. Its coordinates are 39.28711, -76.72320.
More EV charging around Catonsville
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 252016, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bge Mud Cedar Run 2, Catonsville, MD (AFDC station 252016)”, https://chargecensus.com/stations/maryland/bge-mud-cedar-run-2-252016 (data as of October 12, 2026).