2000 Tower Oaks Blvd.
AvailableEV charging station in Rockville, Maryland on the ViaLynk network — 5 Level 2. US DOE AFDC station 458778.
At a glance
2000 Tower Oaks Blvd. is a public EV charging station at 2000 Tower Oaks Blvd in Rockville, Maryland, on the ViaLynk network. It has 5 charging ports (5 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 5, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458778 |
| Network | ViaLynk |
| Status | Available (E) |
| Access | Public |
| Open date | May 5, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Destination · Available
- 915 Meeting30 ports
Noodoe · Available
- The Wilson & The Elm Apex Garage23 ports
AmpUp · Available
- Aerie20 ports
Loop · Available
- Maza Gallerie20 ports
Nayax Energy · Available
- Monarch Condominium - Main Level17 ports
Blink · Available
What kind of charging does 2000 Tower Oaks Blvd. offer?
Of its 5 ports, 5 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 47% above the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 2000 Tower Oaks Blvd. compare with other stations in Rockville?
Rockville has 92 charging stations in the DOE registry with 271 ports, the 3rd-most of 248 cities and towns in Maryland. 2000 Tower Oaks Blvd. accounts for 2% of the charging ports in Rockville. It is the only ViaLynk station in Rockville. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates 2000 Tower Oaks Blvd.?
ViaLynk operates 1,012 stations in the registry across 35 states, with 616 DC fast and 4,903 Level 2 ports in total. 2 of those stations are in Maryland, under 1% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 5, 2026, one of 96 stations in Maryland with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 2000 Tower Oaks Blvd. have?
2000 Tower Oaks Blvd. has 5 charging ports: 5 Level 2.
Does 2000 Tower Oaks Blvd. have DC fast charging?
No. The registry lists no DC fast ports here; its 5 ports are all Level 2.
What connectors does 2000 Tower Oaks Blvd. have?
2000 Tower Oaks Blvd. has J1772 connectors.
Is 2000 Tower Oaks Blvd. open to the public?
Yes. 2000 Tower Oaks Blvd. is listed with public access, and its status is available.
Where is 2000 Tower Oaks Blvd.?
2000 Tower Oaks Blvd. is at 2000 Tower Oaks Blvd, Rockville, MD 20852. Its coordinates are 39.06599, -77.15272.
More EV charging around Rockville
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458778, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “2000 Tower Oaks Blvd., Rockville, MD (AFDC station 458778)”, https://chargecensus.com/stations/maryland/2000-tower-oaks-blvd-458778 (data as of October 12, 2026).