AvailableEV charging station in Kuttawa, Kentucky, not on a charging network — 1 Level 2. US DOE AFDC station 445581.
At a glance
Lake Barkley Resource and Power Plant is a private EV charging station at 8439 US Hwy 62 W in Kuttawa, Kentucky, not attached to a charging network. It has 1 charging port (1 Level 2) with NEMA 14-50 connectors. The US DOE registry lists it as available, open since Aug 5, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 445581 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Federal government |
| Open date | Aug 5, 2025 |
| Last updated at source | Oct 7, 2026 |
Plugs
Connectors & pricing
- NEMA 14-50 — 240V outlet (RV-style plug).
Pricing: not listed in the DOE registry.
Location
- Address
- 8439 US Hwy 62 W
- City
- Kuttawa
- State
- Kentucky
- ZIP
- 42055
- Coordinates
- 37.03142, -88.21943
Within ~15 km
Nearby charging
What kind of charging does Lake Barkley Resource and Power Plant offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Kentucky average of 3 ports per station. The registry lists one connector type: NEMA 14-50, 240V outlet (RV-style plug). The site is listed as a federal government location. It is flagged as workplace charging.
How does Lake Barkley Resource and Power Plant compare with other stations in Kuttawa?
Kuttawa has 3 charging stations in the DOE registry with 17 ports. Lake Barkley Resource and Power Plant accounts for 6% of the charging ports in Kuttawa. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Lake Barkley Resource and Power Plant?
Lake Barkley Resource and Power Plant is listed as non-networked: its chargers are not run through a charging-network account. Kentucky has 110 non-networked stations, 24% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Aug 5, 2025, one of 78 stations in Kentucky with a 2025 open date. The station's record was last updated at the source on Oct 7, 2026.
Frequently asked questions
How many chargers does Lake Barkley Resource and Power Plant have?
Lake Barkley Resource and Power Plant has 1 charging port: 1 Level 2.
Does Lake Barkley Resource and Power Plant have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Lake Barkley Resource and Power Plant have?
Lake Barkley Resource and Power Plant has NEMA 14-50 connectors.
Is Lake Barkley Resource and Power Plant open to the public?
No. Lake Barkley Resource and Power Plant is listed with private access.
Where is Lake Barkley Resource and Power Plant?
Lake Barkley Resource and Power Plant is at 8439 US Hwy 62 W, Kuttawa, KY 42055. Its coordinates are 37.03142, -88.21943.
More EV charging around Kuttawa
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 445581, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lake Barkley Resource and Power Plant, Kuttawa, KY (AFDC station 445581)”, https://chargecensus.com/stations/kentucky/lake-barkley-resource-and-power-plant-445581 (data as of October 12, 2026).