ChargeCensus

Gtb Gtb 2

Available

EV charging station in Grand Rivers, Kentucky on the ChargePoint network — 2 Level 2. US DOE AFDC station 187939.

At a glance

Gtb Gtb 2 is a public EV charging station at 263 Green Turtle Bay Dr in Grand Rivers, Kentucky, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 24, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 5 nearby

Station record

DOE registry record

FieldValue
AFDC station ID187939
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 24, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
263 Green Turtle Bay Dr
City
Grand Rivers
ZIP
42045
Coordinates
37.00800, -88.22674

Within ~15 km

Nearby charging

What kind of charging does Gtb Gtb 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Gtb Gtb 2 compare with other stations in Grand Rivers?

Grand Rivers has 2 charging stations in the DOE registry with 4 ports. Gtb Gtb 2 accounts for 50% of the charging ports in Grand Rivers. ChargePoint runs 2 stations in Grand Rivers. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.

Who operates Gtb Gtb 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 160 of those stations are in Kentucky, 34% of the state's 466.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 24, 2021, one of 48 stations in Kentucky with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Gtb Gtb 2 have?

Gtb Gtb 2 has 2 charging ports: 2 Level 2.

Does Gtb Gtb 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Gtb Gtb 2 have?

Gtb Gtb 2 has J1772 connectors.

Is Gtb Gtb 2 open to the public?

Yes. Gtb Gtb 2 is listed with public access, and its status is available.

Where is Gtb Gtb 2?

Gtb Gtb 2 is at 263 Green Turtle Bay Dr, Grand Rivers, KY 42045. Its coordinates are 37.00800, -88.22674.

More EV charging around Grand Rivers

Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 187939, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Gtb Gtb 2, Grand Rivers, KY (AFDC station 187939)”, https://chargecensus.com/stations/kentucky/gtb-gtb-2-187939 (data as of October 12, 2026).