Hotel Lotus Merriam
AvailableEV charging station in Merriam, Kansas on the Universal EV Chargers network — 1 Level 2. US DOE AFDC station 384232.
At a glance
Hotel Lotus Merriam is a public EV charging station at 9009 Shawnee Mission Pkwy in Merriam, Kansas, on the Universal EV Chargers network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 31, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 384232 |
| Network | Universal EV Chargers |
| Status | Available (E) |
| Access | Public |
| Facility | Hotel |
| Open date | Dec 31, 2024 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Charging network
Operates 326 stations in the DOE registry — view the full network →
Location
- Address
- 9009 Shawnee Mission Pkwy
- City
- Merriam
- State
- Kansas
- ZIP
- 66203
- Coordinates
- 39.01362, -94.69051
Within ~15 km
Nearby charging
- Mission, KS - Tesla Supercharger20 ports
Tesla Supercharger · Available
- century towers kcfd12 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Lenexa, KS - Tesla Supercharger12 ports
Tesla Supercharger · Available
- East Parking lot10 ports
Blink · Available
What kind of charging does Hotel Lotus Merriam offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a hotel location.
How does Hotel Lotus Merriam compare with other stations in Merriam?
Merriam has 8 charging stations in the DOE registry with 14 ports, the 17th-most of 92 cities and towns in Kansas. Hotel Lotus Merriam accounts for 7% of the charging ports in Merriam. It is the only Universal EV Chargers station in Merriam. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.
Who operates Hotel Lotus Merriam?
Universal EV Chargers operates 326 stations in the registry across 17 states, with 320 DC fast and 604 Level 2 ports in total. 2 of those stations are in Kansas, under 1% of the state's 627.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 31, 2024, one of 75 stations in Kansas with a 2024 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Hotel Lotus Merriam have?
Hotel Lotus Merriam has 1 charging port: 1 Level 2.
Does Hotel Lotus Merriam have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Hotel Lotus Merriam have?
Hotel Lotus Merriam has J1772 connectors.
Is Hotel Lotus Merriam open to the public?
Yes. Hotel Lotus Merriam is listed with public access, and its status is available.
Where is Hotel Lotus Merriam?
Hotel Lotus Merriam is at 9009 Shawnee Mission Pkwy, Merriam, KS 66203. Its coordinates are 39.01362, -94.69051.
More EV charging around Merriam
Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 384232, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hotel Lotus Merriam, Merriam, KS (AFDC station 384232)”, https://chargecensus.com/stations/kansas/hotel-lotus-merriam-384232 (data as of October 12, 2026).