East Parking lot
AvailableEV charging station in Shawnee, Kansas on the Blink network — 10 Level 2. US DOE AFDC station 383749.
At a glance
East Parking lot is a public EV charging station at 8711 Shawnee Mission Parkway in Shawnee, Kansas, on the Blink network. It has 10 charging ports (10 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 7, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 383749 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 7, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Mission, KS - Tesla Supercharger20 ports
Tesla Supercharger · Available
- century towers kcfd12 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Lenexa, KS - Tesla Supercharger12 ports
Tesla Supercharger · Available
- West Parking lot10 ports
Blink · Available
What kind of charging does East Parking lot offer?
Of its 10 ports, 10 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.8 times the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does East Parking lot compare with other stations in Shawnee?
Shawnee has 21 charging stations in the DOE registry with 59 ports, the 6th-most of 92 cities and towns in Kansas. East Parking lot accounts for 17% of the charging ports in Shawnee. Blink runs 3 stations in Shawnee. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.
Who operates East Parking lot?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 38 of those stations are in Kansas, 6% of the state's 627.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 7, 2025, one of 70 stations in Kansas with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does East Parking lot have?
East Parking lot has 10 charging ports: 10 Level 2.
Does East Parking lot have DC fast charging?
No. The registry lists no DC fast ports here; its 10 ports are all Level 2.
What connectors does East Parking lot have?
East Parking lot has J1772 connectors.
Is East Parking lot open to the public?
Yes. East Parking lot is listed with public access, and its status is available.
Where is East Parking lot?
East Parking lot is at 8711 Shawnee Mission Parkway, Shawnee, KS 66202. Its coordinates are 39.01354, -94.68772.
More EV charging around Shawnee
Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 383749, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “East Parking lot, Shawnee, KS (AFDC station 383749)”, https://chargecensus.com/stations/kansas/east-parking-lot-383749 (data as of October 12, 2026).