Evergy @Fh Dis Ctr402b
AvailableEV charging station in Manhattan, Kansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 120950.
At a glance
Evergy @Fh Dis Ctr402b is a public EV charging station at 315 S 3rd St @ Flint Hills Discovery Center in Manhattan, Kansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 27, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 120950 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 27, 2019 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Target - Tesla Supercharger8 ports
Tesla Supercharger · Available
Tesla Destination · Available
- Evergy @Stadium -409a2 ports
ChargePoint · Available
- Evergy @Fh Dis Ctr402a2 ports
ChargePoint · Available
- Murdock Manhattan2 ports
Synergev · Available
- Atc South Station 12 ports
ChargePoint · Available
What kind of charging does Evergy @Fh Dis Ctr402b offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Evergy @Fh Dis Ctr402b compare with other stations in Manhattan?
Manhattan has 14 charging stations in the DOE registry with 30 ports, the 10th-most of 92 cities and towns in Kansas. Evergy @Fh Dis Ctr402b accounts for 7% of the charging ports in Manhattan. ChargePoint runs 8 stations in Manhattan. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.
Who operates Evergy @Fh Dis Ctr402b?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 413 of those stations are in Kansas, 66% of the state's 627.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 27, 2019, one of 24 stations in Kansas with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Evergy @Fh Dis Ctr402b have?
Evergy @Fh Dis Ctr402b has 2 charging ports: 2 Level 2.
Does Evergy @Fh Dis Ctr402b have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Evergy @Fh Dis Ctr402b have?
Evergy @Fh Dis Ctr402b has J1772 connectors.
Is Evergy @Fh Dis Ctr402b open to the public?
Yes. Evergy @Fh Dis Ctr402b is listed with public access, and its status is available.
Where is Evergy @Fh Dis Ctr402b?
Evergy @Fh Dis Ctr402b is at 315 S 3rd St @ Flint Hills Discovery Center, Manhattan, KS 66502. Its coordinates are 39.17592, -96.55949.
More EV charging around Manhattan
Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 120950, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Evergy @Fh Dis Ctr402b, Manhattan, KS (AFDC station 120950)”, https://chargecensus.com/stations/kansas/evergy-fh-dis-ctr402b-120950 (data as of October 12, 2026).