ChargeCensus

Evergy @Fh Dis Ctr402a

Available

EV charging station in Manhattan, Kansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 173895.

At a glance

Evergy @Fh Dis Ctr402a is a public EV charging station at 315 S. 3rd St @ Flint Hills Discovery Center in Manhattan, Kansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID173895
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
315 S. 3rd St @ Flint Hills Discovery Center
State
Kansas
ZIP
66502
Coordinates
39.17594, -96.55949

Within ~15 km

Nearby charging

What kind of charging does Evergy @Fh Dis Ctr402a offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Evergy @Fh Dis Ctr402a compare with other stations in Manhattan?

Manhattan has 14 charging stations in the DOE registry with 30 ports, the 10th-most of 92 cities and towns in Kansas. Evergy @Fh Dis Ctr402a accounts for 7% of the charging ports in Manhattan. ChargePoint runs 8 stations in Manhattan. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.

Who operates Evergy @Fh Dis Ctr402a?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 413 of those stations are in Kansas, 66% of the state's 627.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 170 stations in Kansas with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Evergy @Fh Dis Ctr402a have?

Evergy @Fh Dis Ctr402a has 2 charging ports: 2 Level 2.

Does Evergy @Fh Dis Ctr402a have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Evergy @Fh Dis Ctr402a have?

Evergy @Fh Dis Ctr402a has J1772 connectors.

Is Evergy @Fh Dis Ctr402a open to the public?

Yes. Evergy @Fh Dis Ctr402a is listed with public access, and its status is available.

Where is Evergy @Fh Dis Ctr402a?

Evergy @Fh Dis Ctr402a is at 315 S. 3rd St @ Flint Hills Discovery Center, Manhattan, KS 66502. Its coordinates are 39.17594, -96.55949.

More EV charging around Manhattan

Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 173895, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Evergy @Fh Dis Ctr402a, Manhattan, KS (AFDC station 173895)”, https://chargecensus.com/stations/kansas/evergy-fh-dis-ctr402a-173895 (data as of October 12, 2026).