ChargeCensus

Evergy @Centenial-077b

Available

EV charging station in Overland Park, Kansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 122979.

At a glance

Evergy @Centenial-077b is a public EV charging station at 12002 Hayes St @ Centennial Park Apts Pool in Overland Park, Kansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 22, 2019.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID122979
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 22, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
12002 Hayes St @ Centennial Park Apts Pool
State
Kansas
ZIP
66213
Coordinates
38.91114, -94.69095

Within ~15 km

Nearby charging

What kind of charging does Evergy @Centenial-077b offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Evergy @Centenial-077b compare with other stations in Overland Park?

Overland Park has 144 charging stations in the DOE registry with 329 ports, the most of 92 cities and towns in Kansas. Evergy @Centenial-077b accounts for under 1% of the charging ports in Overland Park. ChargePoint runs 119 stations in Overland Park. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.

Who operates Evergy @Centenial-077b?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 413 of those stations are in Kansas, 66% of the state's 627.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 22, 2019, one of 24 stations in Kansas with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Evergy @Centenial-077b have?

Evergy @Centenial-077b has 2 charging ports: 2 Level 2.

Does Evergy @Centenial-077b have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Evergy @Centenial-077b have?

Evergy @Centenial-077b has J1772 connectors.

Is Evergy @Centenial-077b open to the public?

Yes. Evergy @Centenial-077b is listed with public access, and its status is available.

Where is Evergy @Centenial-077b?

Evergy @Centenial-077b is at 12002 Hayes St @ Centennial Park Apts Pool, Overland Park, KS 66213. Its coordinates are 38.91114, -94.69095.

More EV charging around Overland Park

Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 122979, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Evergy @Centenial-077b, Overland Park, KS (AFDC station 122979)”, https://chargecensus.com/stations/kansas/evergy-centenial-077b-122979 (data as of October 12, 2026).