ChargeCensus

Walton Centennial

Available

EV charging station in Roswell, Georgia on the Blink network — 2 Level 2. US DOE AFDC station 314501.

At a glance

Walton Centennial is a public EV charging station at 900 Walton Way in Roswell, Georgia, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 19, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID314501
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateOct 19, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
900 Walton Way
State
Georgia
ZIP
30076
Coordinates
34.01219, -84.29978

Within ~15 km

Nearby charging

What kind of charging does Walton Centennial offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Walton Centennial compare with other stations in Roswell?

Roswell has 23 charging stations in the DOE registry with 75 ports, the 21st-most of 243 cities and towns in Georgia. Walton Centennial accounts for 3% of the charging ports in Roswell. Blink runs 2 stations in Roswell. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Walton Centennial?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 201 of those stations are in Georgia, 8% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2023, one of 308 stations in Georgia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Walton Centennial have?

Walton Centennial has 2 charging ports: 2 Level 2.

Does Walton Centennial have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Walton Centennial have?

Walton Centennial has J1772 connectors.

Is Walton Centennial open to the public?

Yes. Walton Centennial is listed with public access, and its status is available.

Where is Walton Centennial?

Walton Centennial is at 900 Walton Way, Roswell, GA 30076. Its coordinates are 34.01219, -84.29978.

More EV charging around Roswell

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 314501, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Walton Centennial, Roswell, GA (AFDC station 314501)”, https://chargecensus.com/stations/georgia/walton-centennial-314501 (data as of October 12, 2026).