ChargeCensus

The Station At Brighton

Available

EV charging station in Grovetown, Georgia on the Blink network — 2 Level 2. US DOE AFDC station 193179.

At a glance

The Station At Brighton is a public EV charging station at 1000 Station Drive in Grovetown, Georgia, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 26, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID193179
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJul 26, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
1000 Station Drive
City
Grovetown
State
Georgia
ZIP
30813
Coordinates
33.46484, -82.19866

Within ~15 km

Nearby charging

What kind of charging does The Station At Brighton offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”.

How does The Station At Brighton compare with other stations in Grovetown?

Grovetown has 4 charging stations in the DOE registry with 12 ports. The Station At Brighton accounts for 17% of the charging ports in Grovetown. Blink runs 2 stations in Grovetown. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates The Station At Brighton?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 201 of those stations are in Georgia, 8% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 26, 2021, one of 391 stations in Georgia with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does The Station At Brighton have?

The Station At Brighton has 2 charging ports: 2 Level 2.

Does The Station At Brighton have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does The Station At Brighton have?

The Station At Brighton has J1772 connectors.

Is charging at The Station At Brighton free?

Pricing as reported to the DOE registry: Free.

Is The Station At Brighton open to the public?

Yes. The Station At Brighton is listed with public access, and its status is available.

Where is The Station At Brighton?

The Station At Brighton is at 1000 Station Drive, Grovetown, GA 30813. Its coordinates are 33.46484, -82.19866.

More EV charging around Grovetown

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 193179, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “The Station At Brighton, Grovetown, GA (AFDC station 193179)”, https://chargecensus.com/stations/georgia/the-station-at-brighton-193179 (data as of October 12, 2026).