SWTCH Energy Inc.
AvailableEV charging station in Waleska, Georgia on the SWTCH network — 2 Level 2. US DOE AFDC station 341759.
At a glance
SWTCH Energy Inc. is a public EV charging station at Baxter Cir in Waleska, Georgia, on the SWTCH network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 3, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 341759 |
| Network | SWTCH |
| Status | Available (E) |
| Access | Public |
| Facility | Multi-unit dwelling |
| Open date | Apr 3, 2024 |
| Last updated at source | May 8, 2024 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.95 per hour
Location
- Address
- Baxter Cir
- City
- Waleska
- State
- Georgia
- ZIP
- 30183
- Coordinates
- 34.31980, -84.54980
Within ~15 km
Nearby charging
- City of Canton10 ports
EnviroSpark · Available
- Walmart EV Charging8 ports
Walmart · Available
- Shottenkirk Ford - Jasper5 ports
Blink · Available
- Swtch Energy3 ports
SWTCH · Available
Tesla Destination · Available
- Northside EV Northside Ev32 ports
ChargePoint · Available
What kind of charging does SWTCH Energy Inc. offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.95 per hour”. The site is listed as a multi-unit dwelling location.
How does SWTCH Energy Inc. compare with other stations in Waleska?
Waleska has 7 charging stations in the DOE registry with 13 ports. SWTCH Energy Inc. accounts for 15% of the charging ports in Waleska. SWTCH runs 7 stations in Waleska. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates SWTCH Energy Inc.?
SWTCH operates 657 stations in the registry across 32 states, with 318 DC fast and 2,390 Level 2 ports in total. 21 of those stations are in Georgia, under 1% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 3, 2024, one of 431 stations in Georgia with a 2024 open date. The station's record was last updated at the source on May 8, 2024.
Frequently asked questions
How many chargers does SWTCH Energy Inc. have?
SWTCH Energy Inc. has 2 charging ports: 2 Level 2.
Does SWTCH Energy Inc. have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does SWTCH Energy Inc. have?
SWTCH Energy Inc. has J1772 connectors.
Is charging at SWTCH Energy Inc. free?
Pricing as reported to the DOE registry: $0.95 per hour.
Is SWTCH Energy Inc. open to the public?
Yes. SWTCH Energy Inc. is listed with public access, and its status is available.
Where is SWTCH Energy Inc.?
SWTCH Energy Inc. is at Baxter Cir, Waleska, GA 30183. Its coordinates are 34.31980, -84.54980.
More EV charging around Waleska
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 341759, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “SWTCH Energy Inc., Waleska, GA (AFDC station 341759)”, https://chargecensus.com/stations/georgia/swtch-energy-inc-341759 (data as of October 12, 2026).