Spence Fast Charger 1
AvailableEV charging station in Thomasville, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 261774.
At a glance
Spence Fast Charger 1 is a public EV charging station at 11646 US-319 in Thomasville, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Jun 2, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 261774 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 2, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 11646 US-319
- City
- Thomasville
- State
- Georgia
- ZIP
- 31757
- Coordinates
- 30.86350, -83.94214
Within ~15 km
Nearby charging
- Flowers Nissan1 ports
Non-networked · Available
- Flowers Nissan1 ports
Non-networked · Available
- Spence Spence #21 ports
ChargePoint · Available
What kind of charging does Spence Fast Charger 1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.
How does Spence Fast Charger 1 compare with other stations in Thomasville?
Thomasville has 4 charging stations in the DOE registry with 4 ports. Spence Fast Charger 1 accounts for 25% of the charging ports in Thomasville. ChargePoint runs 2 stations in Thomasville. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Spence Fast Charger 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 2, 2023, one of 308 stations in Georgia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Spence Fast Charger 1 have?
Spence Fast Charger 1 has 1 charging port: 1 DC fast.
Does Spence Fast Charger 1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Spence Fast Charger 1, with CCS and NACS (Tesla) connectors.
What connectors does Spence Fast Charger 1 have?
Spence Fast Charger 1 has CCS and NACS (Tesla) connectors.
Is Spence Fast Charger 1 open to the public?
Yes. Spence Fast Charger 1 is listed with public access, and its status is available.
Where is Spence Fast Charger 1?
Spence Fast Charger 1 is at 11646 US-319, Thomasville, GA 31757. Its coordinates are 30.86350, -83.94214.
More EV charging around Thomasville
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 261774, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Spence Fast Charger 1, Thomasville, GA (AFDC station 261774)”, https://chargecensus.com/stations/georgia/spence-fast-charger-1-261774 (data as of October 12, 2026).