ChargeCensus

Royal Centre Two

Available

EV charging station in Alpharetta, Georgia on the Blink network — 4 Level 2. US DOE AFDC station 148644.

At a glance

Royal Centre Two is a public EV charging station at 11575 Great Oaks Way in Alpharetta, Georgia, on the Blink network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 23, 2015.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID148644
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateNov 23, 2015
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: FREE

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
11575 Great Oaks Way
State
Georgia
ZIP
30022
Coordinates
34.06033, -84.27008

Within ~15 km

Nearby charging

What kind of charging does Royal Centre Two offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 16% above the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “FREE”.

How does Royal Centre Two compare with other stations in Alpharetta?

Alpharetta has 72 charging stations in the DOE registry with 264 ports, the 2nd-most of 243 cities and towns in Georgia. Royal Centre Two accounts for 2% of the charging ports in Alpharetta. Blink runs 9 stations in Alpharetta. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Royal Centre Two?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 201 of those stations are in Georgia, 8% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 23, 2015, one of 44 stations in Georgia with a 2015 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Royal Centre Two have?

Royal Centre Two has 4 charging ports: 4 Level 2.

Does Royal Centre Two have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Royal Centre Two have?

Royal Centre Two has J1772 connectors.

Is charging at Royal Centre Two free?

Pricing as reported to the DOE registry: FREE.

Is Royal Centre Two open to the public?

Yes. Royal Centre Two is listed with public access, and its status is available.

Where is Royal Centre Two?

Royal Centre Two is at 11575 Great Oaks Way, Alpharetta, GA 30022. Its coordinates are 34.06033, -84.27008.

More EV charging around Alpharetta

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 148644, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Royal Centre Two, Alpharetta, GA (AFDC station 148644)”, https://chargecensus.com/stations/georgia/royal-centre-two-148644 (data as of October 12, 2026).