ChargeCensus

Row At Barrett Barrettmb 67&68

Available

EV charging station in Kennesaw, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 331858.

At a glance

Row At Barrett Barrettmb 67&68 is a public EV charging station at 2650 Cobb Pl Ln NW in Kennesaw, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 6, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID331858
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 6, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2650 Cobb Pl Ln NW
State
Georgia
ZIP
30144
Coordinates
34.01697, -84.57207

Within ~15 km

Nearby charging

What kind of charging does Row At Barrett Barrettmb 67&68 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Row At Barrett Barrettmb 67&68 compare with other stations in Kennesaw?

Kennesaw has 23 charging stations in the DOE registry with 88 ports, the 22nd-most of 243 cities and towns in Georgia. Row At Barrett Barrettmb 67&68 accounts for 2% of the charging ports in Kennesaw. ChargePoint runs 12 stations in Kennesaw. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Row At Barrett Barrettmb 67&68?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 6, 2024, one of 431 stations in Georgia with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Row At Barrett Barrettmb 67&68 have?

Row At Barrett Barrettmb 67&68 has 2 charging ports: 2 Level 2.

Does Row At Barrett Barrettmb 67&68 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Row At Barrett Barrettmb 67&68 have?

Row At Barrett Barrettmb 67&68 has J1772 connectors.

Is Row At Barrett Barrettmb 67&68 open to the public?

Yes. Row At Barrett Barrettmb 67&68 is listed with public access, and its status is available.

Where is Row At Barrett Barrettmb 67&68?

Row At Barrett Barrettmb 67&68 is at 2650 Cobb Pl Ln NW, Kennesaw, GA 30144. Its coordinates are 34.01697, -84.57207.

More EV charging around Kennesaw

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 331858, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Row At Barrett Barrettmb 67&68, Kennesaw, GA (AFDC station 331858)”, https://chargecensus.com/stations/georgia/row-at-barrett-barrettmb-67-68-331858 (data as of October 12, 2026).