ChargeCensus

Row At Barrett Barrett Surface

Available

EV charging station in Kennesaw, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 470585.

At a glance

Row At Barrett Barrett Surface is a public EV charging station at 2650 Cobb Pl Ln NW in Kennesaw, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 26, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID470585
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 26, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2650 Cobb Pl Ln NW
State
Georgia
ZIP
30144
Coordinates
34.01704, -84.57214

Within ~15 km

Nearby charging

What kind of charging does Row At Barrett Barrett Surface offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Row At Barrett Barrett Surface compare with other stations in Kennesaw?

Kennesaw has 23 charging stations in the DOE registry with 88 ports, the 22nd-most of 243 cities and towns in Georgia. Row At Barrett Barrett Surface accounts for 2% of the charging ports in Kennesaw. ChargePoint runs 12 stations in Kennesaw. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Row At Barrett Barrett Surface?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 26, 2026, one of 203 stations in Georgia with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Row At Barrett Barrett Surface have?

Row At Barrett Barrett Surface has 2 charging ports: 2 Level 2.

Does Row At Barrett Barrett Surface have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Row At Barrett Barrett Surface have?

Row At Barrett Barrett Surface has J1772 connectors.

Is Row At Barrett Barrett Surface open to the public?

Yes. Row At Barrett Barrett Surface is listed with public access, and its status is available.

Where is Row At Barrett Barrett Surface?

Row At Barrett Barrett Surface is at 2650 Cobb Pl Ln NW, Kennesaw, GA 30144. Its coordinates are 34.01704, -84.57214.

More EV charging around Kennesaw

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 470585, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Row At Barrett Barrett Surface, Kennesaw, GA (AFDC station 470585)”, https://chargecensus.com/stations/georgia/row-at-barrett-barrett-surface-470585 (data as of October 12, 2026).