Premier Plaza Pp Two
AvailableEV charging station in Sandy Springs, Georgia on the ChargePoint network — 1 Level 2. US DOE AFDC station 252654.
At a glance
Premier Plaza Pp Two is a public EV charging station at 5605 Glenridge Dr in Sandy Springs, Georgia, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 30, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 252654 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 30, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5605 Glenridge Dr
- City
- Sandy Springs
- State
- Georgia
- ZIP
- 30342
- Coordinates
- 33.90699, -84.36338
Within ~15 km
Nearby charging
- South Atlanta Ga Sdc236 ports
Non-networked · Available
- Electric Owl Holdings48 ports
EnviroSpark · Available
- Truist Headquarters Garage42 ports
Flash · Available
- Bellamy Executive Park32 ports
Blink · Available
- Atlanta, GA - Tesla Supercharger30 ports
Tesla Supercharger · Available
Tesla Destination · Available
What kind of charging does Premier Plaza Pp Two offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Premier Plaza Pp Two compare with other stations in Sandy Springs?
Sandy Springs has 27 charging stations in the DOE registry with 61 ports, the 15th-most of 243 cities and towns in Georgia. Premier Plaza Pp Two accounts for 2% of the charging ports in Sandy Springs. ChargePoint runs 23 stations in Sandy Springs. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Premier Plaza Pp Two?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 30, 2023, one of 308 stations in Georgia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Premier Plaza Pp Two have?
Premier Plaza Pp Two has 1 charging port: 1 Level 2.
Does Premier Plaza Pp Two have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Premier Plaza Pp Two have?
Premier Plaza Pp Two has J1772 connectors.
Is Premier Plaza Pp Two open to the public?
Yes. Premier Plaza Pp Two is listed with public access, and its status is available.
Where is Premier Plaza Pp Two?
Premier Plaza Pp Two is at 5605 Glenridge Dr, Sandy Springs, GA 30342. Its coordinates are 33.90699, -84.36338.
More EV charging around Sandy Springs
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 252654, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Premier Plaza Pp Two, Sandy Springs, GA (AFDC station 252654)”, https://chargecensus.com/stations/georgia/premier-plaza-pp-two-252654 (data as of October 12, 2026).