Pf Parking Lot US Soccer M #2
AvailableEV charging station in Fayetteville, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 458369.
At a glance
Pf Parking Lot US Soccer M #2 is a public EV charging station at 302 Lees Mill Road in Fayetteville, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 29, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458369 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 29, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 302 Lees Mill Road
- City
- Fayetteville
- State
- Georgia
- ZIP
- 30214
- Coordinates
- 33.50374, -84.51379
Within ~15 km
Nearby charging
Non-networked · Available
- Google12 ports
ChargePoint · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Destination · Available
What kind of charging does Pf Parking Lot US Soccer M #2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pf Parking Lot US Soccer M #2 compare with other stations in Fayetteville?
Fayetteville has 43 charging stations in the DOE registry with 92 ports, the 7th-most of 243 cities and towns in Georgia. Pf Parking Lot US Soccer M #2 accounts for 2% of the charging ports in Fayetteville. ChargePoint runs 42 stations in Fayetteville. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Pf Parking Lot US Soccer M #2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 29, 2026, one of 203 stations in Georgia with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pf Parking Lot US Soccer M #2 have?
Pf Parking Lot US Soccer M #2 has 2 charging ports: 2 Level 2.
Does Pf Parking Lot US Soccer M #2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pf Parking Lot US Soccer M #2 have?
Pf Parking Lot US Soccer M #2 has J1772 connectors.
Is Pf Parking Lot US Soccer M #2 open to the public?
Yes. Pf Parking Lot US Soccer M #2 is listed with public access, and its status is available.
Where is Pf Parking Lot US Soccer M #2?
Pf Parking Lot US Soccer M #2 is at 302 Lees Mill Road, Fayetteville, GA 30214. Its coordinates are 33.50374, -84.51379.
More EV charging around Fayetteville
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458369, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pf Parking Lot US Soccer M #2, Fayetteville, GA (AFDC station 458369)”, https://chargecensus.com/stations/georgia/pf-parking-lot-us-soccer-m-2-458369 (data as of October 12, 2026).