Os Managed Woodspring 3
AvailableEV charging station in Ellabell, Georgia on the ChargePoint network — 1 Level 2. US DOE AFDC station 448801.
At a glance
Os Managed Woodspring 3 is a public EV charging station at 350 Interstate Exchange Way in Ellabell, Georgia, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 6, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 448801 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 6, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 350 Interstate Exchange Way
- City
- Ellabell
- State
- Georgia
- ZIP
- 31308
- Coordinates
- 32.17853, -81.45532
Within ~15 km
Nearby charging
- Komar Distribution Services10 ports
ViaLynk · Available
- Pilot Travel Center 13904 ports
EVgo · Available
- Os Managed Woodspring 22 ports
ChargePoint · Available
- Os Managed Woodspring 12 ports
ChargePoint · Available
What kind of charging does Os Managed Woodspring 3 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Os Managed Woodspring 3 compare with other stations in Ellabell?
Ellabell has 5 charging stations in the DOE registry with 19 ports. Os Managed Woodspring 3 accounts for 5% of the charging ports in Ellabell. ChargePoint runs 3 stations in Ellabell. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Os Managed Woodspring 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 6, 2026, one of 203 stations in Georgia with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Os Managed Woodspring 3 have?
Os Managed Woodspring 3 has 1 charging port: 1 Level 2.
Does Os Managed Woodspring 3 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Os Managed Woodspring 3 have?
Os Managed Woodspring 3 has J1772 connectors.
Is Os Managed Woodspring 3 open to the public?
Yes. Os Managed Woodspring 3 is listed with public access, and its status is available.
Where is Os Managed Woodspring 3?
Os Managed Woodspring 3 is at 350 Interstate Exchange Way, Ellabell, GA 31308. Its coordinates are 32.17853, -81.45532.
More EV charging around Ellabell
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 448801, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Os Managed Woodspring 3, Ellabell, GA (AFDC station 448801)”, https://chargecensus.com/stations/georgia/os-managed-woodspring-3-448801 (data as of October 12, 2026).