Lets Charge Notting Hill-2
AvailableEV charging station in Dunwoody, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 312692.
At a glance
Lets Charge Notting Hill-2 is a public EV charging station at 7213 Madison Dr in Dunwoody, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 11, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 312692 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 11, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- South Atlanta Ga Sdc236 ports
Non-networked · Available
- Truist Headquarters Garage42 ports
Flash · Available
- Bellamy Executive Park32 ports
Blink · Available
- Atlanta, GA - Tesla Supercharger30 ports
Tesla Supercharger · Available
- 1050 Brickworks22 ports
Blink · Available
- Hub Atlanta21 ports
Loop · Available
What kind of charging does Lets Charge Notting Hill-2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Lets Charge Notting Hill-2 compare with other stations in Dunwoody?
Dunwoody has 24 charging stations in the DOE registry with 75 ports, the 20th-most of 243 cities and towns in Georgia. Lets Charge Notting Hill-2 accounts for 3% of the charging ports in Dunwoody. ChargePoint runs 19 stations in Dunwoody. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Lets Charge Notting Hill-2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 11, 2023, one of 308 stations in Georgia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Lets Charge Notting Hill-2 have?
Lets Charge Notting Hill-2 has 2 charging ports: 2 Level 2.
Does Lets Charge Notting Hill-2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Lets Charge Notting Hill-2 have?
Lets Charge Notting Hill-2 has J1772 connectors.
Is Lets Charge Notting Hill-2 open to the public?
Yes. Lets Charge Notting Hill-2 is listed with public access, and its status is available.
Where is Lets Charge Notting Hill-2?
Lets Charge Notting Hill-2 is at 7213 Madison Dr, Dunwoody, GA 30346. Its coordinates are 33.92943, -84.33147.
More EV charging around Dunwoody
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 312692, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lets Charge Notting Hill-2, Dunwoody, GA (AFDC station 312692)”, https://chargecensus.com/stations/georgia/lets-charge-notting-hill-2-312692 (data as of October 12, 2026).