Jlrb Electric Off Network 2
AvailableEV charging station in Atlanta, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 312808.
At a glance
Jlrb Electric Off Network 2 is a public EV charging station at 3040 Piedmont Rd NE in Atlanta, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Oct 12, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 312808 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 12, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- South Atlanta Ga Sdc236 ports
Non-networked · Available
- Electric Owl Holdings48 ports
EnviroSpark · Available
- Truist Headquarters Garage42 ports
Flash · Available
- Allora Eastland40 ports
Blink · Available
- Bellamy Executive Park32 ports
Blink · Available
- Atlanta, GA - Tesla Supercharger30 ports
Tesla Supercharger · Available
What kind of charging does Jlrb Electric Off Network 2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Jlrb Electric Off Network 2 compare with other stations in Atlanta?
Atlanta has 773 charging stations in the DOE registry with 2,748 ports, the most of 243 cities and towns in Georgia. Jlrb Electric Off Network 2 accounts for under 1% of the charging ports in Atlanta. ChargePoint runs 528 stations in Atlanta. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Jlrb Electric Off Network 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 12, 2023, one of 308 stations in Georgia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Jlrb Electric Off Network 2 have?
Jlrb Electric Off Network 2 has 1 charging port: 1 DC fast.
Does Jlrb Electric Off Network 2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Jlrb Electric Off Network 2, with CCS connectors.
What connectors does Jlrb Electric Off Network 2 have?
Jlrb Electric Off Network 2 has CCS connectors.
Is Jlrb Electric Off Network 2 open to the public?
Yes. Jlrb Electric Off Network 2 is listed with public access, and its status is available.
Where is Jlrb Electric Off Network 2?
Jlrb Electric Off Network 2 is at 3040 Piedmont Rd NE, Atlanta, GA 30305. Its coordinates are 33.83780, -84.36919.
More EV charging around Atlanta
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 312808, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Jlrb Electric Off Network 2, Atlanta, GA (AFDC station 312808)”, https://chargecensus.com/stations/georgia/jlrb-electric-off-network-2-312808 (data as of October 12, 2026).