Ikea_fc Savannah-Ct4k 1
AvailableEV charging station in Port Wentworth, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 388265.
At a glance
Ikea_fc Savannah-Ct4k 1 is a public EV charging station at 202 Little Hearst Parkway in Port Wentworth, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 22, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 388265 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 22, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 202 Little Hearst Parkway
- City
- Port Wentworth
- State
- Georgia
- ZIP
- 31407
- Coordinates
- 32.17564, -81.17248
Within ~15 km
Nearby charging
- JC Lewis Ford Pooler GA14 ports
Red E · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Port Wentworth Elementary10 ports
EnviroSpark · Available
- Georgia Port Authority10 ports
EnviroSpark · Available
Tesla Supercharger · Available
What kind of charging does Ikea_fc Savannah-Ct4k 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ikea_fc Savannah-Ct4k 1 compare with other stations in Port Wentworth?
Port Wentworth has 4 charging stations in the DOE registry with 13 ports. Ikea_fc Savannah-Ct4k 1 accounts for 15% of the charging ports in Port Wentworth. ChargePoint runs 2 stations in Port Wentworth. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Ikea_fc Savannah-Ct4k 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 22, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ikea_fc Savannah-Ct4k 1 have?
Ikea_fc Savannah-Ct4k 1 has 2 charging ports: 2 Level 2.
Does Ikea_fc Savannah-Ct4k 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ikea_fc Savannah-Ct4k 1 have?
Ikea_fc Savannah-Ct4k 1 has J1772 connectors.
Is Ikea_fc Savannah-Ct4k 1 open to the public?
Yes. Ikea_fc Savannah-Ct4k 1 is listed with public access, and its status is available.
Where is Ikea_fc Savannah-Ct4k 1?
Ikea_fc Savannah-Ct4k 1 is at 202 Little Hearst Parkway, Port Wentworth, GA 31407. Its coordinates are 32.17564, -81.17248.
More EV charging around Port Wentworth
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 388265, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ikea_fc Savannah-Ct4k 1, Port Wentworth, GA (AFDC station 388265)”, https://chargecensus.com/stations/georgia/ikea-fc-savannah-ct4k-1-388265 (data as of October 12, 2026).