ChargeCensus

Hinesville Cpe250

Available

EV charging station in Hinesville, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 387998.

At a glance

Hinesville Cpe250 is a public EV charging station at 126 E M L King Jr Dr in Hinesville, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 19, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 5 nearby

Station record

DOE registry record

FieldValue
AFDC station ID387998
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 19, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
126 E M L King Jr Dr
City
Hinesville
State
Georgia
ZIP
31313
Coordinates
31.84663, -81.59431

Within ~15 km

Nearby charging

What kind of charging does Hinesville Cpe250 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Hinesville Cpe250 compare with other stations in Hinesville?

Hinesville has 5 charging stations in the DOE registry with 9 ports. Hinesville Cpe250 accounts for 11% of the charging ports in Hinesville. ChargePoint runs 2 stations in Hinesville. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Hinesville Cpe250?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 19, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Hinesville Cpe250 have?

Hinesville Cpe250 has 1 charging port: 1 DC fast.

Does Hinesville Cpe250 have DC fast charging?

Yes. The registry lists 1 DC fast port at Hinesville Cpe250, with CHAdeMO and CCS connectors.

What connectors does Hinesville Cpe250 have?

Hinesville Cpe250 has CHAdeMO and CCS connectors.

Is Hinesville Cpe250 open to the public?

Yes. Hinesville Cpe250 is listed with public access, and its status is available.

Where is Hinesville Cpe250?

Hinesville Cpe250 is at 126 E M L King Jr Dr, Hinesville, GA 31313. Its coordinates are 31.84663, -81.59431.

More EV charging around Hinesville

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 387998, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hinesville Cpe250, Hinesville, GA (AFDC station 387998)”, https://chargecensus.com/stations/georgia/hinesville-cpe250-387998 (data as of October 12, 2026).