Gwinettcdjr Pl1 Stone
AvailableEV charging station in Stone Mountain, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 323320.
At a glance
Gwinettcdjr Pl1 Stone is a public EV charging station at 5054 U.S. 78 in Stone Mountain, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Dec 22, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 323320 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 22, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5054 U.S. 78
- City
- Stone Mountain
- State
- Georgia
- ZIP
- 30087
- Coordinates
- 33.82473, -84.10255
Within ~15 km
Nearby charging
- NORTH METRO - P&DC (Duluth) GA144 ports
Non-networked · Available
- Electric Owl Holdings48 ports
EnviroSpark · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Dekalb County Jail Parking Deck16 ports
EnviroSpark · Available
Tesla Supercharger · Available
What kind of charging does Gwinettcdjr Pl1 Stone offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Gwinettcdjr Pl1 Stone compare with other stations in Stone Mountain?
Stone Mountain has 13 charging stations in the DOE registry with 41 ports. Gwinettcdjr Pl1 Stone accounts for 2% of the charging ports in Stone Mountain. ChargePoint runs 8 stations in Stone Mountain. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Gwinettcdjr Pl1 Stone?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 22, 2023, one of 308 stations in Georgia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gwinettcdjr Pl1 Stone have?
Gwinettcdjr Pl1 Stone has 1 charging port: 1 DC fast.
Does Gwinettcdjr Pl1 Stone have DC fast charging?
Yes. The registry lists 1 DC fast port at Gwinettcdjr Pl1 Stone, with CCS connectors.
What connectors does Gwinettcdjr Pl1 Stone have?
Gwinettcdjr Pl1 Stone has CCS connectors.
Is Gwinettcdjr Pl1 Stone open to the public?
Yes. Gwinettcdjr Pl1 Stone is listed with public access, and its status is available.
Where is Gwinettcdjr Pl1 Stone?
Gwinettcdjr Pl1 Stone is at 5054 U.S. 78, Stone Mountain, GA 30087. Its coordinates are 33.82473, -84.10255.
More EV charging around Stone Mountain
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 323320, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gwinettcdjr Pl1 Stone, Stone Mountain, GA (AFDC station 323320)”, https://chargecensus.com/stations/georgia/gwinettcdjr-pl1-stone-323320 (data as of October 12, 2026).