ChargeCensus

Gerresheimer_us Gpc_02

Available

EV charging station in Peachtree City, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 216594.

At a glance

Gerresheimer_us Gpc_02 is a public EV charging station at 650 Hwy 74 S in Peachtree City, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 5, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID216594
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 5, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
650 Hwy 74 S
State
Georgia
ZIP
30269
Coordinates
33.36338, -84.56152

Within ~15 km

Nearby charging

What kind of charging does Gerresheimer_us Gpc_02 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Gerresheimer_us Gpc_02 compare with other stations in Peachtree City?

Peachtree City has 14 charging stations in the DOE registry with 55 ports. Gerresheimer_us Gpc_02 accounts for 4% of the charging ports in Peachtree City. ChargePoint runs 7 stations in Peachtree City. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Gerresheimer_us Gpc_02?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 5, 2022, one of 219 stations in Georgia with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Gerresheimer_us Gpc_02 have?

Gerresheimer_us Gpc_02 has 2 charging ports: 2 Level 2.

Does Gerresheimer_us Gpc_02 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Gerresheimer_us Gpc_02 have?

Gerresheimer_us Gpc_02 has J1772 connectors.

Is Gerresheimer_us Gpc_02 open to the public?

Yes. Gerresheimer_us Gpc_02 is listed with public access, and its status is available.

Where is Gerresheimer_us Gpc_02?

Gerresheimer_us Gpc_02 is at 650 Hwy 74 S, Peachtree City, GA 30269. Its coordinates are 33.36338, -84.56152.

More EV charging around Peachtree City

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 216594, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Gerresheimer_us Gpc_02, Peachtree City, GA (AFDC station 216594)”, https://chargecensus.com/stations/georgia/gerresheimer-us-gpc-02-216594 (data as of October 12, 2026).