Georgia Power Wills Rd L2
AvailableEV charging station in Alpharetta, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 172010.
At a glance
Georgia Power Wills Rd L2 is a public EV charging station at 11675 Wills Rd in Alpharetta, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 172010 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 11675 Wills Rd
- City
- Alpharetta
- State
- Georgia
- ZIP
- 30009
- Coordinates
- 34.06452, -84.31173
Within ~15 km
Nearby charging
- Duluth, GA - Tesla Supercharger24 ports
Tesla Supercharger · Available
- LeasePlan - Tesla Destination20 ports
Tesla Destination · Available
Flipturn · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Georgia Power Wills Rd L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Georgia Power Wills Rd L2 compare with other stations in Alpharetta?
Alpharetta has 72 charging stations in the DOE registry with 264 ports, the 2nd-most of 243 cities and towns in Georgia. Georgia Power Wills Rd L2 accounts for under 1% of the charging ports in Alpharetta. ChargePoint runs 35 stations in Alpharetta. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Georgia Power Wills Rd L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 391 stations in Georgia with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Georgia Power Wills Rd L2 have?
Georgia Power Wills Rd L2 has 2 charging ports: 2 Level 2.
Does Georgia Power Wills Rd L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Georgia Power Wills Rd L2 have?
Georgia Power Wills Rd L2 has J1772 connectors.
Is Georgia Power Wills Rd L2 open to the public?
Yes. Georgia Power Wills Rd L2 is listed with public access, and its status is available.
Where is Georgia Power Wills Rd L2?
Georgia Power Wills Rd L2 is at 11675 Wills Rd, Alpharetta, GA 30009. Its coordinates are 34.06452, -84.31173.
More EV charging around Alpharetta
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 172010, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Georgia Power Wills Rd L2, Alpharetta, GA (AFDC station 172010)”, https://chargecensus.com/stations/georgia/georgia-power-wills-rd-l2-172010 (data as of October 12, 2026).