Georgia Power Lakeland Dc2
AvailableEV charging station in Lakeland, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 375540.
At a glance
Georgia Power Lakeland Dc2 is a public EV charging station at 18 S Valdosta Rd in Lakeland, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 14, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 375540 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 14, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 18 S Valdosta Rd
- City
- Lakeland
- State
- Georgia
- ZIP
- 31635
- Coordinates
- 31.03986, -83.07512
Within ~15 km
Nearby charging
- Moody AFB12 ports
Non-networked · Available
- Georgia Power Lakeland Dc11 ports
ChargePoint · Available
What kind of charging does Georgia Power Lakeland Dc2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Georgia Power Lakeland Dc2 compare with other stations in Lakeland?
Lakeland has 2 charging stations in the DOE registry with 2 ports. Georgia Power Lakeland Dc2 accounts for 50% of the charging ports in Lakeland. ChargePoint runs 2 stations in Lakeland. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Georgia Power Lakeland Dc2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 14, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Georgia Power Lakeland Dc2 have?
Georgia Power Lakeland Dc2 has 1 charging port: 1 DC fast.
Does Georgia Power Lakeland Dc2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Georgia Power Lakeland Dc2, with CHAdeMO and CCS connectors.
What connectors does Georgia Power Lakeland Dc2 have?
Georgia Power Lakeland Dc2 has CHAdeMO and CCS connectors.
Is Georgia Power Lakeland Dc2 open to the public?
Yes. Georgia Power Lakeland Dc2 is listed with public access, and its status is available.
Where is Georgia Power Lakeland Dc2?
Georgia Power Lakeland Dc2 is at 18 S Valdosta Rd, Lakeland, GA 31635. Its coordinates are 31.03986, -83.07512.
More EV charging around Lakeland
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 375540, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Georgia Power Lakeland Dc2, Lakeland, GA (AFDC station 375540)”, https://chargecensus.com/stations/georgia/georgia-power-lakeland-dc2-375540 (data as of October 12, 2026).