Georgia Power Gpc Metter Dc
AvailableEV charging station in Metter, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 189346.
At a glance
Georgia Power Gpc Metter Dc is a public EV charging station at 1118 S Lewis St in Metter, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 7, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 189346 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 7, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1118 S Lewis St
- City
- Metter
- State
- Georgia
- ZIP
- 30439
- Coordinates
- 32.37895, -82.06252
Within ~15 km
Nearby charging
- Metter Ford10 ports
Red E · Available
Tesla Supercharger · Available
- Georgia Power Gpc Metter L22 ports
ChargePoint · Available
What kind of charging does Georgia Power Gpc Metter Dc offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Georgia Power Gpc Metter Dc compare with other stations in Metter?
Metter has 4 charging stations in the DOE registry with 21 ports. Georgia Power Gpc Metter Dc accounts for 5% of the charging ports in Metter. ChargePoint runs 2 stations in Metter. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Georgia Power Gpc Metter Dc?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 7, 2021, one of 391 stations in Georgia with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Georgia Power Gpc Metter Dc have?
Georgia Power Gpc Metter Dc has 1 charging port: 1 DC fast.
Does Georgia Power Gpc Metter Dc have DC fast charging?
Yes. The registry lists 1 DC fast port at Georgia Power Gpc Metter Dc, with CHAdeMO and CCS connectors.
What connectors does Georgia Power Gpc Metter Dc have?
Georgia Power Gpc Metter Dc has CHAdeMO and CCS connectors.
Is Georgia Power Gpc Metter Dc open to the public?
Yes. Georgia Power Gpc Metter Dc is listed with public access, and its status is available.
Where is Georgia Power Gpc Metter Dc?
Georgia Power Gpc Metter Dc is at 1118 S Lewis St, Metter, GA 30439. Its coordinates are 32.37895, -82.06252.
More EV charging around Metter
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 189346, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Georgia Power Gpc Metter Dc, Metter, GA (AFDC station 189346)”, https://chargecensus.com/stations/georgia/georgia-power-gpc-metter-dc-189346 (data as of October 12, 2026).