Georgia Power Cuthbert Dc2
AvailableEV charging station in Cuthbert, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 328764.
At a glance
Georgia Power Cuthbert Dc2 is a public EV charging station at 61 E Dawson St in Cuthbert, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Feb 20, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 328764 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 20, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 61 E Dawson St
- City
- Cuthbert
- State
- Georgia
- ZIP
- 39840
- Coordinates
- 31.77100, -84.78790
Within ~15 km
Nearby charging
- Georgia Power Cuthbert Dc11 ports
ChargePoint · Available
What kind of charging does Georgia Power Cuthbert Dc2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.
How does Georgia Power Cuthbert Dc2 compare with other stations in Cuthbert?
Cuthbert has 2 charging stations in the DOE registry with 2 ports. Georgia Power Cuthbert Dc2 accounts for 50% of the charging ports in Cuthbert. ChargePoint runs 2 stations in Cuthbert. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Georgia Power Cuthbert Dc2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 20, 2024, one of 431 stations in Georgia with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Georgia Power Cuthbert Dc2 have?
Georgia Power Cuthbert Dc2 has 1 charging port: 1 DC fast.
Does Georgia Power Cuthbert Dc2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Georgia Power Cuthbert Dc2, with CCS and NACS (Tesla) connectors.
What connectors does Georgia Power Cuthbert Dc2 have?
Georgia Power Cuthbert Dc2 has CCS and NACS (Tesla) connectors.
Is Georgia Power Cuthbert Dc2 open to the public?
Yes. Georgia Power Cuthbert Dc2 is listed with public access, and its status is available.
Where is Georgia Power Cuthbert Dc2?
Georgia Power Cuthbert Dc2 is at 61 E Dawson St, Cuthbert, GA 39840. Its coordinates are 31.77100, -84.78790.
More EV charging around Cuthbert
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 328764, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Georgia Power Cuthbert Dc2, Cuthbert, GA (AFDC station 328764)”, https://chargecensus.com/stations/georgia/georgia-power-cuthbert-dc2-328764 (data as of October 12, 2026).