At a glance
Georgia Power Bremen L2 is a public EV charging station at 125 US-27 in Bremen, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 172354 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 125 US-27
- City
- Bremen
- State
- Georgia
- ZIP
- 30110
- Coordinates
- 33.69257, -85.15111
Within ~15 km
Nearby charging
- Pilot Travel Center 4174 ports
EVgo · Available
- Pugmire Ford of Carrollton4 ports
Ford Charge · Available
- Pilot Travel Center 3124 ports
EVgo · Available
ChargePoint · Available
- John Thornton Cadillac1 ports
EV Connect · Available
- Scott Evans Nissan1 ports
Non-networked · Available
What kind of charging does Georgia Power Bremen L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Georgia Power Bremen L2 compare with other stations in Bremen?
Bremen has 4 charging stations in the DOE registry with 5 ports. Georgia Power Bremen L2 accounts for 40% of the charging ports in Bremen. ChargePoint runs 4 stations in Bremen. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Georgia Power Bremen L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 391 stations in Georgia with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Georgia Power Bremen L2 have?
Georgia Power Bremen L2 has 2 charging ports: 2 Level 2.
Does Georgia Power Bremen L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Georgia Power Bremen L2 have?
Georgia Power Bremen L2 has J1772 connectors.
Is Georgia Power Bremen L2 open to the public?
Yes. Georgia Power Bremen L2 is listed with public access, and its status is available.
Where is Georgia Power Bremen L2?
Georgia Power Bremen L2 is at 125 US-27, Bremen, GA 30110. Its coordinates are 33.69257, -85.15111.
More EV charging around Bremen
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 172354, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Georgia Power Bremen L2, Bremen, GA (AFDC station 172354)”, https://chargecensus.com/stations/georgia/georgia-power-bremen-l2-172354 (data as of October 12, 2026).